McDonald & Ross Const. Ltd. was contracted by FortisBC for the installation of 1720m of 323mm OD intermediate pressure, sweet natural gas pipeline along Riverside Street and Hallert Road as well as through FortisBC’s right of way. The project included the clearing and grubbing of the right of way working as a liaison with all landowners and residents directly affected by the project, identifying, locating and daylighting all utilities, providing all labour, equipment and materials for the installation of the 1720m 323mm pipe, directional drilling - 366m,, provide welding and joint completion for the pipe, pressure and leak testing of the pipe, as well as restoration of all surrounding areas.