Transmission Remediation
-
picture gallery (10)
McDonald & Ross Const. Ltd. has worked with BC Hydro and Power Authority at various transmission tower sites in the Lower Mainland inspecting and repairing damaged transmission tower legs. Work included excavation of tower legs, sandblasting and coating tower legs, construction of forms (done at McDonald & Ross shop) welding, fabricating, backfilling and landscaping restorations of individual sites and mowing and clearing access around tower sites as required.