McDonald & Ross was contracted by Kinder Morgan Canada for the Burnaby Tank Farm Reservoir Upgrades.
The Project included:
• Mobilization to site
• Building access road to pond
• Laying culvert
• Fusing 14HDPE pipe
• Building landing area for directional drill
• Hydrovac reservoir & footing
• Draining water reservoir
• Directional drill through berm
• Placement of 8” barrels/re-bar
• Crane used to place concrete bases on site
• Pouring footings
• Tarp entire work area
• Fuse 14” pipe and install 14” gate
• Drilling holes in barrel and grout inside barrel/reservoir
• Site Remediation