McDonald & Ross Const. Ltd. was contracted by Terasen Gas Inc. to complete the installation of one 470m long, 406mm OD TP, sweet natural gas, temporary by-pass pipeline as well as the removal of 470m, 406mm OD, TP by-pass pipeline.