McDonald & Ross Const. Ltd. was contracted by the City of Abbotsford for the project referred to as the "Clearbrook CICP Road, Sanitary, Storm and Water Upgrades". The project included the installation of 420m of 19m wide paved industrial internal circulation road; 210m of 250mm watermain within internal circulation road; 540m of 250mm gravity sanitary sewer within right of way on 1812 Foy Street, 31786 Marshall Road & 31898 Marshall Road West & 800m of 525mm to 900mm gravity storm sewer within right of way on 1812 Foy Street, 31786 Marshall Road & 31898 Marshall West and bio-infiltration pond.