McDonald & Ross was contracted by FortisBC for the Elk River Pipeline Crossing at Elkford, BC. The project included the clearing and grubbing of site as required under supervision of Environmental monitor. Complete the works in the dry (western) portion of the existing channel. Excavatation and removal of abandoned pipe. Cutting back at least 2m beyond backslope. Construct Boulder grade control riffle. Excavatation of pilot channel. Rip Rap armour existing westerly bank. Diversion of existing water into newly constructed pilot channel using a combination of sand bags and poly. Construction work on eastern side of channel. Built rock spur. Placed boulder clusters. Remove old pipe
Construct Boulder control Riffle on eastern side of channel. Armour eastern banks. Remove diversion structures and site remediation.