Abbotsford Salton Road Pedestrian Cycle Facility
-
Picture gallery (35)
McDonald & Ross was contracted by the City of Abbotsford for the "civil works" for the Salton Road Pedestrian and Cycle Facility. The contract was for the replacement of 130m of sanitary sewer; 2300m2 of roadway widening; installation of 9 storm catch basins; 800m of new concrete curb; 500m2 of concrete sidewalks and driveways; asphalt paving; traffic signal and street lighting improvements; survey layout ; clearing and removals; landscaping and site restoration