Savona Tie-ins Masurement Facilities
-
photo gallery (7)
McDonald & Ross Const. Ltd. worked at the Savona Pipeline - Tie-ins Measurement Facilities fabricating and installing two tie-in measurement facilities. Piping was prefabricated and tested at our shop (see Shop Work). The piping was then cut and hauled by heavy haul units to the Savona site. The work included all piping related tasks including equipment removal and relocation, installation of piping and valve work, pipe coating and supports and re-instatement of site.