Serpentine River Crossing
-
picture gallery (14)
McDonald & Ross Const. Ltd. was involved in all aspects of construction, pipeline hydrostatic testing, drying and tie-in operations along with 406m of directional drilling at the Serpentine River Crossing, Surrey, BC.