McDonald & Ross Const. Ltd. was contracted by the Township of Langley for the construction of an aboveground pressure reducing valve station and installation of 219m of 200mm diameter watermain to connect the Tall Timber water distribution system to the watermain at 56th Avenue and 237A Street.
• The new watermain crosses an existing 1050mm diameter Fortis BC Transmission Pressure gas main at 237A Street.
• The main follows a pedestrian access road at 237A Street and tie into the existing water system at the end of the cul-de-sac on 237A Street.
This project required co-ordination with Friesen Electric for the construction and installation of the PRV kiosk