McDonald & Ross Const. Ltd. as “Prime Contractor” with Dan Dick as Superintendent was contracted by Kinder Morgan Canada, Inc. for the secondary containment and leak detection upgrades at Tank 93, 201 and 202 located at Westridge Terminal.
The project included:
• mobilization to site
• site preparation, hydro excavation
• installation of leak detection ports (22)
• backfill and grade North containment wall below liner
• backfill and grade at leak detection ports below liner
• Liner installation
• Post liner installation includes backfilling and grading along North containment wall
• leak detection ports and at Tank 93
• Site cleanup and demobilization.