Yakh Trail , Salmo River Repair
-
Picture gallery (10)
McDonald & Ross Const. Ltd. was contracted by FortisBC for • Construct access from site to laydown area. • Construct Access to work site • Clear brush and long grass • Culvert or gravel wet spots • Install barriers in water to make bridge to cross river • Move materials from laydown area to work site with rubber tracked dump truck • Fortify banks with rip rap and groynes with boulders • Remove bridge • Site remediation • Demobilization