Home
About Us
ISNetworld
Certification
Social Responsibility
Contact Us
McDONALD & ROSS CONST. LTD.
Specialists in civil works, in-stream works, pipeline construction, BC hydro tower excavations and more
Home
About Us
ISNetworld
Certification
Social Responsibility
Contact Us
Top
Home
About Us
ISNetworld
Certification
Social Responsibility
Contact Us
Navigation
Civil Works including Road & Sidewalk Construction
In and Around Water Works
Culverts, Headwalls & Bridges
Pipeline Projects
Directional Drill Projects
Oil & Gas Terminal Work
Tank Liner Projects
Sandblasting, Coating, Testing & Drying & Pigging
Station Fabrication & Demo
Hydro Tower & Grillage Restoration & Remediation
Landscaping & Outdoor Maintenance Work
Snow Removal
Login
In and Around Water
Similkameen River Pipeline Crossing Mitigation
Elk River 4 Pipeline Crossing
Elk River 1, Sparwood, BC
Yakh Trail , Salmo River Repair
Buntzen Lake Pumphouse Service Road Bridge
Clemina Creek, Valemount, BC
Finn Creek, Blue River, BC
Swift Creek, Valemount, BC
Salmon River Washout
Salmon River, Langley, BC
Merritt IP -Coldwater River
Cheam Creek, Chilliwack, BC
R/W at Ponder Park
Cub and Price Creek
Morse Creek Tributary
Coquihalla River
Seymour River Crossing
Buntzen Lake Pumphouse Service Road Bridge
> picture gallery
Digging out old wood and bridge for pads to sit on
Taking out old bridge and pads and setting up dewatering system
BC Hydro's Environmentalist cathing fish prior to digging
Dewatering the creek
McRoss employees getting area to grade prior to base slab
Setting road pads for temporary bridge
Old BC Hydro access bridge removed, swamp pads placed until new bridge is built
Building lockblock wall for new bridge deck
Setting gravel, ground cloth and then lockblocks
Base Layer
Bringing material, to grade
Setting slabs for bridge deck
Building bridge support/geotextile placed before each layer of lockblocks
Setting new bridge deck - two slabs of concrete
Side view of bridge deck
Placing bridge deck
Bridge deck in place with creek restoration using riprap
Finished deck with temporary railing
Placement of riprap alongside bridge, temporary railing installed
Setting railings on new bridge deck
McDonald & Ross Const. Ltd.